Organisator: Fabian Laszlo
Timeplan
Organizing:
Label the important stuff in the basement: End of January
Remove the trash/store away the sill needed items: Mid of February
Infrastructure:
1. Have the 230 and 400V in the basement
Tools&Equipment:
Rough&Optimistic ideas: {{:tischlerecke:timeplanning.png?200|}}
(Made with Project Libre, i will upload the source file too, one i manage to master this wiki thing)
Maschines we have
"Bigger" Machine | Eigentümer(Owner) | Manufacturer | Status |
-------------------------- | ----------------- | -------------- | ------------- |
HC260 Abricht&Dickenhobel | Laszlo | Elektra Beckum | Not Yet in r3 |
Chip extractor | Laszlo | Elektra Beckum | Not Yet in r3 |
Table circular saw(small) | Laszlo | Ulmia | Not Yet in r3 |
"Hand" Machine | Eigentümer(Owner) | Manufacturer | Status |
-------------------------- | ----------------- | -------------- | ------ |
TBD | r3 | tbd | in r3 |
Hand-tools | Eigentümer(Owner) | Manufacturer | Status |
---------------------------| ----------------- | -------------- | ------ |
Hand Saw? | r3 | tbd | in r3 |
Maschines&Tools needed
Item | Prio[1-10] | Price Estimate |
---------- | ----------- | -------------- |
Hobelbank/ | 10 | 200E |
WerkTisch | | |