Organisator: Fabian Laszlo

Timeplan

Organizing:

  1. Label the important stuff in the basement: End of January

  2. Remove the trash/store away the sill needed items: Mid of February

Infrastructure:
1. Have the 230 and 400V in the basement

Tools&Equipment:

Rough&Optimistic ideas: {{:tischlerecke:timeplanning.png?200|}}

(Made with Project Libre, i will upload the source file too, one i manage to master this wiki thing)

Maschines we have

"Bigger" Machine | Eigentümer(Owner) | Manufacturer | Status |
-------------------------- | ----------------- | -------------- | ------------- |
HC260 Abricht&Dickenhobel | Laszlo | Elektra Beckum | Not Yet in r3 |
Chip extractor | Laszlo | Elektra Beckum | Not Yet in r3 |
Table circular saw(small) | Laszlo | Ulmia | Not Yet in r3 |


"Hand" Machine | Eigentümer(Owner) | Manufacturer | Status |
-------------------------- | ----------------- | -------------- | ------ |
TBD | r3 | tbd | in r3 |


Hand-tools | Eigentümer(Owner) | Manufacturer | Status |
---------------------------| ----------------- | -------------- | ------ |
Hand Saw? | r3 | tbd | in r3 |

Maschines&Tools needed

Item | Prio[1-10] | Price Estimate |
---------- | ----------- | -------------- |
Hobelbank/ | 10 | 200E |
WerkTisch | | |